The City of Sedalia began work on its annual chip and seal program Monday and motorists are encouraged to find alternate routes on the day work is scheduled for a specific street, or plan additional time to arrive at their destination, as periodic lane closures will occur as equipment and men are working on the streets.

Tuesday, Aug. 20
S. Montgomery Ave. from E. Broadway Blvd. to E. 16th St.
S. Summit Ave. from E. Broadway Blvd. to E. 20th St.
E. 15th St. from S. Engineer Ave. to S. Collins Ave.
E. 15th St. from S. Ingram Ave. to S. Washington Ave.
S. Collins Ave. from E. 16th St. to E. 19th St.
S. Thompson Ave. from E. 16th St. to E. 19th St.

Wednesday, Aug. 21
E. 11th St. from S. Ohio to S. Massachusetts
E. 14th St. from S. Collins Ave. to S. Garfield Ave.
E. 15th St. from S. Garfield Ave to S. Babcock Ave.
S. Babcock Ave. from E. 14th St. to E. 16th St.
E. 12th St. from S. Engineer Ave. to S. Ingram Ave.

More From KIX 105.7